5/3/1 for Strength
Jim Wendler's 5/3/1 method, run as a 4-day split with slow linear progression. Built for long-term strength gains on the big four lifts (squat, bench, deadlift, OHP). Includes deload every 4th week.
A single downloadable training manual containing every plan in the library โ with a cover, table of contents, and full weekly schedules. 400+ pages, perfect for printing or saving offline.